The drop inlets and storm sewer along Lee Street are complete. The bridges at East Caddo Creek and Warren Branch Roadway B are almost complete.
The contractor is installing flexible base for Roadway B and a detour and new location roadway. Construction of the header banks at the KCS Railroad overpass are underway.